Jump to content

Suzanne the LS3 6.2 V8! Caution very long build thread....


Wasso

Recommended Posts

Some update pics from me.

 

So we start the day with an empty engine bay.

 

72348D10-C7B3-4909-92CC-1583CB82A1EA_zpso1wpcy8v.jpg

 

Bolt the gearbox back onto the engine. With the handy work done by Chris for the braided pipe work.

 

4817CFEE-7F8B-46E4-8D19-F3A64B48B328_zpsqztpxdgk.jpg

 

Chris then drills a hole for the clutch feed from the gearbox.

 

527ED6D8-6851-48B1-8C0E-C02566A74D9A_zpsectftyxe.jpg

 

After two test fitting sessions we start the REAL fabrication work to allow the alternator to fit in nicely. Chris also bashes the hell out of the tunnel for the gearbox to ensure we have good clearance for the braided clutch lines.

 

7D15BE54-9CCD-4317-BE74-E0C2882EEFB7_zpswlexkqgf.jpg

 

Time to introduce the V8 into the big hole for the final time.

 

63E86E0B-F15D-425D-8A50-072759B1B2CA_zpsfywzfgar.jpg

 

Then it's IN!!!!!

 

0F50D5CF-0890-4611-AA30-54AF0842B0F2_zpsj5hzfuuj.jpg

 

1616AA37-315F-4B2E-B913-4DD4C6BBC4F5_zps9xdpyy77.jpg

 

F750B353-2C15-4473-A9BA-DB82EE8DB388_zpsqlgcqxqz.jpg

 

Then with the covers on!!

 

Now it's looking SHERRRRRWEEEEET!! :teeth:

 

467CA1CE-6C13-4A37-A560-D895C6B87DFF_zpslz0g2txa.jpg

 

839B4093-6F33-4BF0-99DE-447DB72BD6AA_zpshvpy9rbq.jpg

 

4E25180B-5885-49C9-8C63-88CC2B64768D_zpslghfq1ul.jpg

 

355047CF-D204-4309-AF40-E9E4EB62B764_zpsxxz4faoz.jpg

 

That's it for today. Been a cracking day and one of which I'm over the moon. Chris and Bob have done a splendid job.

 

It's all getting very exciting now.

Edited by Wasso
  • Like 12
Link to comment
Share on other sites

Time for trip to the fabricators for the headers then Ian?

 

Yes for sure. The mid exit headers on there had to be removed, just not enough room.

 

So she will be trailered to Phoenix for the next stage of work.

Link to comment
Share on other sites

Some update pics from me.

 

So we start the day with an empty engine bay.

 

72348D10-C7B3-4909-92CC-1583CB82A1EA_zpso1wpcy8v.jpg

 

Bolt the gearbox back onto the engine. With the handy work done by Chris for the braided pipe work.

 

4817CFEE-7F8B-46E4-8D19-F3A64B48B328_zpsqztpxdgk.jpg

 

Chris then drills a hole for the clutch feed from the gearbox.

 

527ED6D8-6851-48B1-8C0E-C02566A74D9A_zpsectftyxe.jpg

 

After two test fitting sessions we start the REAL fabrication work to allow the alternator to fit in nicely. Chris also bashes the hell out of the tunnel for the gearbox to ensure we have good clearance for the braided clutch lines.

 

7D15BE54-9CCD-4317-BE74-E0C2882EEFB7_zpswlexkqgf.jpg

 

Time to introduce the V8 into the big hole for the final time.

 

63E86E0B-F15D-425D-8A50-072759B1B2CA_zpsfywzfgar.jpg

 

Then it's IN!!!!!

 

0F50D5CF-0890-4611-AA30-54AF0842B0F2_zpsj5hzfuuj.jpg

 

1616AA37-315F-4B2E-B913-4DD4C6BBC4F5_zps9xdpyy77.jpg

 

F750B353-2C15-4473-A9BA-DB82EE8DB388_zpsqlgcqxqz.jpg

 

Then with the covers on!!

 

Now it's looking SHERRRRRWEEEEET!! :teeth:

 

467CA1CE-6C13-4A37-A560-D895C6B87DFF_zpslz0g2txa.jpg

 

839B4093-6F33-4BF0-99DE-447DB72BD6AA_zpshvpy9rbq.jpg

 

4E25180B-5885-49C9-8C63-88CC2B64768D_zpslghfq1ul.jpg

 

355047CF-D204-4309-AF40-E9E4EB62B764_zpsxxz4faoz.jpg

 

That's it for today. Been a cracking day and one of which I'm over the moon. Chris and Bob have done a splendid job.

 

It's all getting very exciting now.

Well done guys! "Tight fit"! Looks like Arnold Schwarzenegger is bursting out of the engine bay! Lol

  • Like 1
Link to comment
Share on other sites

Have to say I'm loving this it's like Petrolhead porn this is my sort of modding getting your hands dirty not just handing over cash and taking credit also says volumes about the community spirit on this forum so many people providing help and encouragement you should all be proud of yourselves just sorry i don't live closer. :D

Keep up the good work :thumbs:

  • Like 4
Link to comment
Share on other sites

This is just absolutely class! Top job so far, but I suspect this is the easy bit? :)

 

Easy for us yes, the hard part is for Phoenix to custom fab exhaust and headers.

 

Just spend the last hour planning the intricate elements of the build over the next 2 months. Silly things like oil, rad, fabrication mounts, diff, wheels all make up the remaining bits.

 

We are hoping end of March - so stay tuned. It may go a bit quiet over the next month whilst at Phoenix.

 

Keep watching and thanks for the nice comments, it keeps us going when there's an element of doubt, and trust me today had a few of those.

  • Like 2
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...