Well after being on the back boiler for a while, great progress has been made this month.
Engine refreshed, new Wossner Pistons, bearings, bolts etc.
Valve seats recut, valves lapped in and adjusted.
New larger Turbos.
New Twin Plate ATS Carbonetic Clutch and Fly.
New PF Front Rotors and Stoptech rears.
Calipers refreshed, new pistons, seals, dirt covers and colour change in case you missed it.
Engine fully run in with Joe Gibbs Performance Break In Oil
Still to do:
Fabricate new larger intercooler and pipework.
Fit Cosworth Plenum.
Weld Idle Control Valve into plenum
Reposition coolant header tank.
Reposition catch can.
Reposition Manual Throttle Body.
Upgrade fuel pump stuff. (again)
Remap and Tune.