Jump to content

Ian

Members
  • Posts

    17,143
  • Joined

  • Last visited

Everything posted by Ian

  1. More parts sold Still plenty left - not all of which is listed in OP
  2. Today was a momentous day, the door went on Dunno whats going on with the shape of the ramp on the first pic Just need to paint the outside, inside and floor and I can start moving in
  3. Ian

    Quick Jack

    Theres someone on here with one similar - Rabbitstew maybe? Id also like to know if they are any good
  4. They were one of the first things to sell sorry
  5. Yeah it’s that fibre stuff Apparently it prevents condensation.
  6. Almost there, just waiting on the new door to arrive. Half of wall done Back wall done 4 LED Strips fitted Ramp into garage laid out and filled
  7. ill have the intake pipe available in about 2 weeks if you can wait that long
  8. Radiator is OEM or I've got a Mishimoto coming off in a few weeks which has the below spec; Overall Size: 29.7" x 21" x 1.92"Core Size: 15.75" x 28.15"Rows: 2Inlet: 1.4"Outlet: 1.4"Core Thickness: 1.42"Tank Wall Thickness: .08"Fill Neck: 1.25"Drain Plug Thread Size: (M16) .06" Drain Plug Thread Length: .047"
  9. Even then it varies massively depending on number of subscribers you have
  10. I’m planning on vlogging my z rebuild once the garage is done
  11. He says he got a grand. You tubers always play down how much they earn
  12. The 500k views of the video probably went a long way to helping
  13. Scaffolding goes up Roof comes off Floor getting marked out Floor getting laid (4 inch thick concrete) Higher sides going up New roof goes on New roof finished Height of new vs old Ramp into garage being dug out Tomorrow should see the start of the interior walls starting to go up
  14. Those of you that have been here long enough may remember the original Z-Shed (Not @Keyser fake one :P) This was where I built my HKS supercharged Z over a winter it was an experience for sure. Last year, I moved house and my sole requirement was either a garage or space to build a garage - the rest of the house the Mrs could have and do what she pleased with. So, we bought a house with a decent sized garage, not quite a double but a decent size none the less As you can see, it needed a bit of work doing to it. After almost 12 months, I finally got around to getting some prices on sorting it out. A few builders came to price up the job and the general consensus was that the roof was unsafe. Tiled roof on a timber structure and it was starting to bow - this was much more work that just getting the floor laid and the walls done On the bright side though, it means I can now get the garage I always wanted (even if its not quite as wide as i'd like) work to be done; Remove roof Raise building structure as high as possible without the need for planning Fit new roof Lay new concrete floor Insulate and board walls New electric roller door New LED lighting strips Fit outside tap Build ramp into garage Work was supposed to take 4 weeks, we are currently coming to the end of the 4th week and still not finished - I reckon still another 2 weeks atleast
×
×
  • Create New...