Jump to content

veilside z

Members
  • Posts

    4,767
  • Joined

  • Last visited

Everything posted by veilside z

  1. The Gunmetal was nice but nowhere near as striking as the orange. Who did the paint job as the car must have been well stripped back to do a complete colour change. It looks a great job. B)
  2. Sent you a Pm buddy.
  3. Can't do this one buddy but must catch up at some time, thank you though for the offer. It wouldn't be in the Z, as you know its been parked up for years. Have a great time buddy and most Importantly, will the new rims be on ??? :)
  4. I sent you the photos of the box and how it looks fitted, it's finally sealed over with the original Bose trim panel cover. Did you get them as you were away.
  5. veilside z

    new wheels pic

    They look different to the norm, are you keeping them that colour?
  6. veilside z

    Wheel nuts

    Really nice looking at a great price
  7. Dipping or wrapping is a good way to go buddy, however they do look nice colour coded to match the car too with the Z badge in a contrasting colour
  8. The other interesting thing was why did it need two people for the test drive, did the young passenger just go for the thrill, of was he the brains behind the outfit. :wacko:
  9. Hello and welcome. Great colour.
  10. Paint them car colour and do the b posts too. I have
  11. Nearly 180 mph? 4.8 seconds on an auto box ??? :wacko:
  12. Hello and welcome. Hope you get the wheel sorted.
  13. Looks fabulous. The Zeds will have a lovely home to roost.
  14. Remember the tank on a UK model holds more litres than a jdm
  15. They look quite nice on the Z
  16. Hello and welcome.
  17. I wonder if they new the cam was live.
  18. The dash does look great, but don't know how much is involved removing the panels in question.
  19. Looking great buddy. Well done you. It will be well worth all the hard work once it finally hits the streets, you will be driving around with a permanent smile on your face. B)
  20. A good reader will be a third of the cost of an hours labour at the Nissan Main Stealer.
  21. I have most of these parts too if the other guys have not got all parts required.
  22. The old Bridgeport milling machine, that bring back memories. The build is coming along nicely Chris, is this new build the the old Z shed renovated or a completely new construction? Also who's garden is this being constructed in. B)
  23. Excellent welcome along and well done you.
  24. Hello and welcome along.
  25. Fair play. I bet the examiner was secretly enjoying it too.
×
×
  • Create New...